Case Study

Lidl Store, Blairgowrie

Client: Muir Construction
Commencement Date: July 2021
Contract Value: £930k
Main Contract Duration: 26

Following the successful delivery of recently completed projects with Muir Construction, Kilmac are delighted to confirm the successful completion of the Groundworks package for the development of the new Lidl store located in Blairgowrie.

The new 1,256m2 supermarket will not only create new jobs within the local community, but will be a welcome retail addition with the added factor of roof mounted solar panels and rapid electric vehicle charging points.

Our clients know that we deliver a comprehensive service from inception to completion, and always work to the highest safety and quality standards.  This was shown again during this contract with on-time delivery, and continued safety standards.  Working collaboratively with other contractors on-site, Kilmac delivered a new sewage system comprising of a small pumping station, which fed into the existing pumping station adjacent to site.  Valued Engineering was used during installation of utilities networks, and lean construction methods were used to deliver the large concrete pour sections to lower floor slabs and upper mezzanine deck. 

© 2022 Kilmac Limited
Web design by Internet Creation
crosschevron-down