The development consisted of the erection of a new shell for the fit out of a new drive thru coffee retail unit for Starbucks. The development is located to the south of Fulton Road, which is situated to the west of Dundee. Access to Fulton Road is gained via Myrekirk Road (east of site) via the roundabout from Kingsway West (A90) (south east of site). The site is surrounded to the north by various commercial and industrial premises that are all accessed from the busy Kingsway West that passes south of site. To the west lies an area of vacant land earmarked for future development with the NCR industrial facility located beyond. The site was chosen due to its strong visual presence on the route of the Dundee outer ring road (A90 dual carriageway), which also provides a large volume of passing vehicular traffic. This road is particularly congested at peak traffic times by commuters and people accessing the surrounding commercial premises, however is continually busy throughout the day. To the east Myrekirk Road provides access to the various commercial, industrial and the Asda Supermarket. Fulton Road provides access to various commercial properties and the NCR Building.
Project was delivered on-time and within budget.
Site Constraints & Requirements
Bulk Earthworks
Site clearance over 2,500m2
Topsoil scrape of 650m3
Excavate & disposal of 800m3 subsoil
In-situ Concrete Works
Construct the reinforced concrete pad and ground beam foundations (approx 100m3) for a 180m2 footprint.
Construct a reinforced concrete floor slab for building of 180m2.
Construct a reinforced concrete external yard slab of 20m2.
Building Works
Supply & construction of steel frame clad building to Client’s specification, incorporating all elements of gas proof membrane, structural & secondary steel, wall & roof cladding, curtain walling, glazing, doors, and cill details.
Drainage
Construct Foul Drainage required (approx. 100lm) including connection to existing drainage at a depth of 5m.
Construct Surface Water Drainage required (approx. 180lm) including main drainage, filter drainage, gravel formed attenuation system, and associated hydro-brake flow control manhole.
Hard Landscaping
Supply and install all kerbing (500m) to the project.
Supply and install Porous Block (325m2) paving construction including gravels, etc.
Supply and install Block Paving (175m2) paving construction including gravels, etc.
Supply and Install all capping and type 1 and grade for all access roads, car parking bays, & footpaths (1000m2) to required levels.
All associated road markings to roads, car parks, and drive-thru road.
Supply & install all required street furniture throughout area (bollards, cycle hoops, guard rails, signage)
Soft Landscaping
Topsoil, shrubs, and bark mulch to all required areas (650m2)
Services
Carry out all service trenching, surrounds and chambers for Incoming Water, Fire Main, Electricity, BT, signage, induction loops, intercom systems, and Street/External Lighting.
Construction of new sub-station base, and associated earth cables and finishes.
Supply of new sub-station.
Supply of new water main supply.
Supply of new telecoms.